{"id":3982,"date":"2019-05-29T15:32:07","date_gmt":"2019-05-29T13:32:07","guid":{"rendered":"https:\/\/www.industronic.com\/blog\/?p=3982"},"modified":"2019-05-31T06:30:06","modified_gmt":"2019-05-31T04:30:06","slug":"project-engineering-at-industronic","status":"publish","type":"post","link":"https:\/\/www.industronic.com\/blog\/project-engineering-at-industronic\/","title":{"rendered":"Project Engineering at INDUSTRONIC"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Post by Anna Bauer<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Today we would like to take the opportunity to introduce our Project Engineering (PJE) team. Our team of 14 project engineers prepare the\nsystem-specific documentation for our customers and for the internal assembling\nprocess. The PJE team cooperates closely with our customers and many other\nteams inside INDUSTRONIC. To plan the cabinets, the team receives the required\ndetails from the sales team which collects all necessary information during the\nbidding stage from the customers. For the intercom and PA\/GA systems, the team members study the specifications and construct\nthe cabinets according to our customers\u2019 needs. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to the construction of the whole system, our\ncolleagues are responsible for project documents like the hardware manual,\ncircuit diagrams, cable plans, bills of material, terminal plans and parts lists.\nTo facilitate their work, the PJE uses\nthe latest CAE systems but also works\nwith proprietary tools from INDUSTRONIC such as the configuration software\nConfig Manager. Depending on the size of the project and the scope of work, the\nengineering and support of entire systems may take from weeks to months or even\nyears for major projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After the commissioning, there might be some changes (redlinings) to the as-built documentation. The PJE receives the returned documents and adapts them according to the changes of the system during the installation at the customer\u00b4s site.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"880\" height=\"587\" src=\"https:\/\/www.industronic.com\/blog\/wp-content\/uploads\/2019\/05\/INDUSTRONIC-Blog.jpg\" alt=\"\" class=\"wp-image-3984\" srcset=\"https:\/\/www.industronic.com\/blog\/wp-content\/uploads\/2019\/05\/INDUSTRONIC-Blog.jpg 880w, https:\/\/www.industronic.com\/blog\/wp-content\/uploads\/2019\/05\/INDUSTRONIC-Blog-300x200.jpg 300w, https:\/\/www.industronic.com\/blog\/wp-content\/uploads\/2019\/05\/INDUSTRONIC-Blog-768x512.jpg 768w, https:\/\/www.industronic.com\/blog\/wp-content\/uploads\/2019\/05\/INDUSTRONIC-Blog-750x500.jpg 750w\" sizes=\"auto, (max-width: 880px) 100vw, 880px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">For\nthe assembly, the plans are double-checked and then handed over to the Work Preparation\nteam which coordinates the manufacturing and assembly of the cabinets. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before\nshipment of the cabinets and other system equipment, a system parameterization\nis prepared by the dedicated engineer for the internal testing in our Testing team.\nAs agreed in the project, we invite our customers or a third party inspector\n(TPI) for the factory acceptance test (FAT), to examine the system before shipment.\nA three-person project team Project Engineering, Project Management and Testing\nis responsible for the visitors and accompanies them during their visit. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The\nPJE is in constant contact with our customers. By e-mail or telephone, they clarify\nopen points directly with the end users and gather necessary information about\ntechnical details such as the placement of loudspeakers or the configuration of\nthe system. &nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As\nyou can see, our PJE team is ready for any challenge and we at INDUSTRONIC are\nready for your project. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Post by Anna Bauer Today we would like to take the opportunity to introduce our Project Engineering (PJE) team. Our team of 14 project engineers prepare the system-specific documentation for our customers and for the internal assembling process. The PJE team cooperates closely with our customers and many other teams inside INDUSTRONIC. To plan the [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3984,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3982","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-inside-industronic-2"],"_links":{"self":[{"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/posts\/3982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/comments?post=3982"}],"version-history":[{"count":4,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/posts\/3982\/revisions"}],"predecessor-version":[{"id":3990,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/posts\/3982\/revisions\/3990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/media\/3984"}],"wp:attachment":[{"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/media?parent=3982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/categories?post=3982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.industronic.com\/blog\/wp-json\/wp\/v2\/tags?post=3982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}